
UNCW King + Alderman Renovations
Project Description: Muter Construction is seeking to prequalify supplier and trade contractors who are interested in bidding the King and Alderman Renovation project at UNC Wilmington. This project encompasses the renovation of both Alderman Hall and King Hall. Alderman Hall, a two-story 26,108 SF building: envelope repairs, code deficiency corrections (ADA, egress, and restroom improvements), mechanical/electrical replacements and new finishes in individual suites and corridors. King Hall, a two-story 22,298 SF building: code deficiency corrections (ADA, egress, and restroom improvements), new fire alarm system, mechanical/electrical replacements, programmatic renovations of the second floor to accommodate the Honors College and new finishes in the public spaces on the first floor.
Outreach Event: As a woman-owned construction firm, we are wholly committed to improving opportunities for minority, women, small and veteran business enterprises through inclusion in our projects. We will hold an Outreach Event on December 6 at 4:00pm via ZOOM. Click here for the ZOOM link.
To Request a Prequalification Package: Email Greg Driver, PE, Project Executive.
Project Manager Contact: Chad Oliver (919) 404-8330
Trade Packages include: (01A) General Trades and Site Labor; (01C) Final Clean; (02A) Hazard Material Abatement; (02B) Selective Demolition; (03A) Concrete; (04A) Masonry; (06A) Millwork; (07A) Roofing; (07B) Insulation; (08A) Storefront, Glass and Glazing; (08B) Doors, Frames, Hardware Material, Accessories Material; (08B) Doors, Frames and Hardware Installation; (09A) Drywall and Framing; (09B) Flooring; (09C) Ceramic Tile; (09D) Acoustical Ceiling; (09E) Painting Sealed Concrete Floors; (10A) Specialties; (10B) Signage; (22B) Plumbing; (23A) HVAC Early Equipment Material Package; (23B) HVAC Installation; (26A) Electrical; (27A) Communications; (28A) Fire Alarm
Estimated Bid Package Release: March 2023