Site/Utilities

Avent Ferry Complex Site Enhancement at NC State

Raleigh, NC
Completed

This project is being completed for NCSU and includes adding new curb and gutter, asphalt, new planters, and all new brick paver sidewalks for the Avent Ferry Dorm. This project was completed in 60 days.  

Tanger Performing Arts Center Sitework

Greensboro, North Carolina
Under Construction

The $84.7M project will bring a state-of-the-art, 3000-seat multipurpose performance venue to downtown Greensboro, NC. Muter Construction is currently working on site development and utilities for the new facility.

NC National Guard Readiness Center Wilmington Site Work

Wilmington, North Carolina
Under Construction

The work for this project includes Surveying, Grading and earthwork, Erosion control, Site demo, Water Utilities, Sewer Utilities (including oil water separator and grease trap), Storm drainage (including sand filters), Curb & gutter, Paving, striping & signage, Exposing asbestos cement water … Continue reading

The Wade Condos

Raleigh, North Carolina
Under Construction

This project consist of new condos near the heart of downtown Raleigh on Wade Avenue. The amenities in this new community include a rooftop terrace, dog washing station for all those Dogs of ITB, fitness room, Google Fiber, signature lobby area, … Continue reading

Duke Energy North Raleigh Warehouse Sanitary Sewer Tie-In

Raleigh, North Carolina
Completed

This project includes furnishing and installation of all Clearing, Erosion Control, and Sanitary Sewer Installation. Work will include all clearing and grubbing of trees required to make a path for utility install. Additional work will include: Cutting and patching of existing … Continue reading

NCNG Raleigh Troop Motor Pool Repaving

Raleigh, North Carolina
Completed

This project includes repaving of two existing parking areas that will include site clearing; demolition;grading; erosion and sediment control; storm drainage structures; curb and gutter; sidewalk;asphalt paving; topsoil spreading, crushed red brick; and seeding and matting. Additional work will include … Continue reading

NCNG Wilmington New Hanover Security Fence Replacement

Wilmington, North Carolina
Completed

One of Muter Construction’s favorite clients to work for is the NC National Guard. What a great group of people to work with! This project includes construction of an 8-ft tall chain link security fence with barbed wire around the … Continue reading

Rockingham County Landfill Access Road Paving and Drainage Improvements

Madison, North Carolina
Completed

Work  for this project includes removal and disposal of existing asphalt material, installation and quality control testing of aggregate base course to achieve proposed pavement limits and elevations, surface preparation and proof rolling of aggregate base course, installation of 4.5-inches … Continue reading

NCSU Weisiger-Brown Parking Lot

Raleigh, North Carolina
Completed

Construction includes construction of a ±75 stall parking lot, complete, including associated sidewalks, storm drainage, stormwater control measures, landscaping, site lighting and other related site elements.

GTCC Center for Advanced Manufacturing Site Utilities and Grading

Greensboro, North Carolina
Completed

This project includes the adaptive reuse of an existing manufacturing building. The Center For Advanced Manufacturing (CAM) will house a variety of spaces supporting GTCC programs including: welding, machining, collision/body repair, automotive repair, heavy equipment repair. Spaces to be constructed … Continue reading