Selma Middle School Metal Roof Retrofit

Selma, North Carolina
Under Construction

This project includes the following: Maintaining integrity of existing single-ply membrane roofing system as indicated on drawings. Design and Installation of Sub-framing for support of a new metal roof. Removal, relocation, extending and offsetting of all existing rooftop edge framing, equipment, stacks, vents, etc. Installation of R-30 fiberglass insulation over all interior attic spaces under the new roof system. Design and Installation of a new, standing seam, interlocking metal roof system complete with all trim, wall panels, flashings, gutters, and accessories. Providing positive ventilation between the existing and new roof, high and low.

DCIM100MEDIAYUN00035.jpg

DCIM100MEDIAYUN00038.jpg

DCIM100MEDIAYUN00036.jpg